NACAP Land & Marine (2007)

40 year design life

As part of a large project to receive LNG and ship natural gas from South Wales into England a 42” pipeline was installed .

NACAP Land & Marine installed the 42” pipeline from Milford Haven to Gloucester.

There was a 1000 metre Horizontal Directional Drill pipe run where polyurethane was used to protect the steel pipe due to the excellent mechanical abrasion resistance properties of this coating.

PU SWAN7

PU SWAN8

PU SWAN9